Top Level Audits

Since we can estimate the costs associated with each ECM accurately, we can develop top level “go-no-go” analysis.  In this manner, we can focus on the ECM’s that make the most economic sense, while relegating the less cost effective measures to a footnote in the design intent document.  Rather than shotgun a system design with every imaginable ECM, we start out with a shotgun during the preliminary design phase, and end up with a laser scalpel in the construction document phase.